Enyi Real Estate PLC – Bole Bulbula Project
Comprehensive works including floor and wall ceramic installations, Hollow Concrete Block (HCB) construction and plastering, precise chiseling, and perforated pipe installation for drainage. This project highlights our finishing expertise and
Enyi Real Estate PLC – Jemo 2 Project
Construction of sample rooms (400m² and 250m² G+2 buildings), involving extensive concrete works, formwork assembly, fence construction, HCB works, plastering, painting, door sill, and window sill installations. Reference: Engineer Elias
Sunshine Construction – Ethiopian Airlines Employees Housing Project
Multiple blocks with specialized works: Block 6 (G+20) featuring shear wall formwork, slab formworks, and safety scaffolding; Block 7 involving shear wall formworks, slab formworks, and reinforced bar works; G+7